Concrete driveway part-way through removal in Mercer Island, King County

Concrete removal on Mercer Island

We are a Seattle concrete removal referral service. Tell us what needs to go and we'll connect you with one local concrete removal company — not five.

✓ One local company, not five
⚡ Free, no-obligation price

Mercer Island has two rules that decide when a concrete job can happen. In landslide hazard areas, and on larger jobs in erosion hazard areas, the city does not allow land clearing, grading, filling or foundation work between October 1 and April 1 without a waiver. And work in the street on school days is generally limited to 9 am to 3:30 pm.

Both rules affect scheduling, so check your lot before you book a date. When you are ready, send us the details and photos. We pass your job to one local concrete removal company, and it is free for you to ask.

Local facts for Mercer Island

Wet season limit
Land clearing, grading, filling and foundation work are not permitted on Mercer Island between October 1 and April 1 within landslide hazard areas, or above 2,000 sq ft of disturbance in an erosion hazard area (MICC 17.14.010 Section 105.3.1), unless a waiver is granted. Source: City of Mercer Island: Wet Season Work Waiver - Seasonal Development Limitation
School-day street hours
Mercer Island right-of-way work hours are generally 9 am to 3:30 pm in the street on school days, and may be further restricted on school bus routes. Source: City of Mercer Island: Right of Way Use Permits
Hazard maps and geotech reports
Mercer Island maps erosion, landslide and seismic hazards, searchable by address in the city's mapping tool, and requires a geotechnical report for work in those hazard areas. Source: City of Mercer Island: Geological Hazards
County transfer station serving Mercer Island
King County's Factoria Recycling and Transfer Station (13800 SE 32nd St, Bellevue) primarily serves the Bellevue, Issaquah, Mercer Island and Sammamish areas. Source: King County: Factoria Recycling and Transfer Station fact sheet

Check your lot for a geologic hazard

The city maps erosion, landslide and seismic hazard areas, and its geological hazards page links to the city's mapping tool, where you can search by address or parcel number. A geotechnical report is required when work is proposed in landslide, steep slope, seismic or erosion hazard areas, among others.

If your property shows a hazard, mention it to anyone quoting. A driveway breakout that also regrades the subbase, or a patio removal on a slope, is the kind of job where the hazard designation can come into play.

The October 1 to April 1 limit

Mercer Island's wet season page, citing MICC 17.14.010 Section 105.3.1, says land clearing, grading, filling and foundation work "are not permitted between October 1 and April 1 within landslide hazard areas, or if more than 2,000 square feet of disturbance is proposed in an erosion hazard area."

A waiver is possible with "compelling justification" backed by a geotechnical evaluation. The application calls for a letter to the Building Official, a geotechnical report, working drawings, an erosion control plan, a construction schedule and emergency procedures. For a small removal, it is usually simpler to plan the work for spring or summer.

  • Landslide hazard area: no clearing, grading, filling or foundation work October 1 to April 1 without a waiver
  • Erosion hazard area: the limit applies above 2,000 sq ft of disturbance

Working in the street

Anything that excavates, alters or blocks the street or sidewalk needs a Right of Way Use permit, applied for by email to the city in PDF form with a site plan and, where traffic or pedestrians are affected, a traffic control plan. The city says "work hours are generally 9 am to 3:30 pm in the street on school days," and may be tighter on school bus routes.

For a driveway apron, that is a short day to saw-cut, break and load. Ask how the work will be split if your street is a bus route.

Questions about concrete removal in Mercer Island

Can I remove a concrete driveway on Mercer Island in winter?

If your lot is a mapped landslide hazard, or an erosion hazard with more than 2,000 sq ft of disturbance, clearing, grading, filling and foundation work are not permitted between October 1 and April 1 without a waiver. If your lot has no mapped hazard, ask the city to confirm the limit does not apply before you book.

How do I find out if my Mercer Island property is in a geologic hazard area?

Search your address or parcel number in the city's mapping tool, linked from its Geological Hazards page.

What hours can contractors work in Mercer Island streets?

Generally 9 am to 3:30 pm on school days, and possibly less on school bus routes, according to the city's right-of-way permit page.

Who do I contact about a Mercer Island right-of-way permit?

Community Planning & Development, 206-275-7605. Applications are emailed as PDFs to epermit.tech@mercerisland.gov.

Near Mercer Island

Sources

  1. City of Mercer Island: Wet Season Work Waiver - Seasonal Development Limitation
  2. City of Mercer Island: Right of Way Use Permits
  3. City of Mercer Island: Geological Hazards
  4. King County: Factoria Recycling and Transfer Station fact sheet

Get a price for Mercer Island

Send a few details and photos if you have them. We come back with a price range, then pass your details to one local concrete removal company. It costs you nothing.

We are a referral service. Your details go to one local concrete removal company — not an auction, and not five companies calling you. They are an independent business, not our employee, so their work, pricing and conduct are theirs.

No obligation. Your details go to one local company, not five.