There is no official Seattle price list for concrete removal. Here is the national benchmark, labelled as national, and the Seattle-area dump fees and permit thresholds that are published, with the date we read each one.
Prices change, and none of the figures below is a price from this site. Every one was read from a national cost guide, a recycling facility fee schedule or a City of Seattle page, last checked on October 13, 2026. Confirm before you act on it.

On this page
There is no official Seattle price list for concrete removal. Crews quote after they have measured the slab, checked for rebar and seen how close a machine can get. What can be pinned down is a national benchmark, which we label as national every time it appears, and the Seattle-area costs that are published: what the recycling yards charge to take the rubble, and where the City’s permit thresholds sit. Every figure below was re-read from its source on 13 October 2026.
- Fixr’s national guide, updated 31 January 2025, puts concrete removal at $2–$6 per square foot, with a national average job of $1,856. That is a United States figure, not a Seattle one.
- Fixr splits that range by reinforcement: $2–$4 per square foot unreinforced against $4–$6 reinforced, nationally.
- Seattle’s own transfer stations do not take concrete, so the rubble has to go to a recycler. On 13 October 2026, Dirt Exchange in Ballard published $80.00 a cubic yard for clean concrete; Reece in Arlington published $6.00 a ton. Volume and weight are not comparable at a glance.
- SDCI says a grading permit is required once you add or replace 750 square feet or more of paving, and its grading page counts removing a hard surface as land-disturbing activity.
- This page publishes no price of its own, and none of the figures should be averaged together.
What actually drives the price
Nobody can price a tear-out from a photo of the surface, because the things that move the bid are underneath it and around it. Fixr’s concrete removal cost guide, a national guide updated 31 January 2025 and re-read on 13 October 2026, names the same handful of factors in its own words:
Access is why a straight run to the curb is a different job from a patio behind a narrow side gate, which is why tearing out a driveway a machine can drive onto prices differently from hand-breaking a backyard patio slab. Reinforcement bites twice: it adds cutting time, and it pushes the rubble into a dearer tier at the recycling yard, as the disposal table below shows.
The national benchmark, and how far to trust it
We could not find an independent, published Seattle price survey for concrete removal. The closest thing to a benchmark is Fixr’s national guide. Read every row below as a United States figure from January 2025, not as a Seattle quote.
| What Fixr prices | National figure |
|---|---|
| Concrete removal, overall | $2–$6 per sq ft; jobs $500–$5,000, national average $1,856 |
| Unreinforced concrete | $2–$4 per sq ft |
| Reinforced concrete (rebar) | $4–$6 per sq ft |
| Patio | $1,000–$2,000 per job |
| Driveway | $1,500–$2,500 per job |
| Sidewalk | $1,200–$2,200 per job |
| Slab | $600–$1,000 per job |
| Steps | $250–$400 per job |
Fixr’s headline sentence is specific about what its average describes: the “national average cost range is $500 – $5,000, with most homeowners paying around $1,856 to remove 600 square feet of concrete sidewalk.” It also splits its per-square-foot range: “about $0.50 to $2 is the cost of disposal”, and “the remaining $1.50 to $4 a square foot is made up of the labor costs, and the costs of bringing the equipment to the job site and other fees”. Labor and disposal both vary by city, so treat these as a sense of proportion, not a Seattle price.

The disposal side of the bill
Seattle Public Utilities lists “Asphalt Paving, Bricks, Concrete” among construction and demolition waste that is not accepted at the city’s transfer stations and “must be taken to a Recycler”, so every removal carries a tipping cost somewhere. Three Puget Sound yards published something about concrete on their own pages on 13 October 2026. Note the unit in each cell: one prices by volume, one by weight, and one publishes only surcharges and a minimum.
| Facility | What it publishes |
|---|---|
| Dirt Exchange, Ballard | $80.00 per cubic yard for clean concrete under 2 ft and no thicker than 8 in, no rebar. $90.00 per cubic yard for oversized or dirty concrete, rebar allowed but it must be cut. $85.00 per cubic yard for a mixed load — concrete mixed with dirt or brush; concrete, brick and asphalt together still count as concrete. |
| Reece Aggregates, Arlington and Lake Stevens | $6.00 per ton for clean concrete under 2 ft and $8.00 per ton over 2 ft. With rebar, $12.00 per ton under 2 ft and $14.00 per ton over. |
| Renton Concrete Recyclers, Renton | No base dump fee published — the page says to call. Published: +$2.00 per cubic yard for material with rebar, a $45.00 minimum charge per load, and a 5% waste disposal fee on all dump charges. |
The unit is the trap. Dirt Exchange charges for the space your rubble takes up in the truck, air included, which is not the same as the volume the slab occupied when it was still a slab:
“Pricing is based on the actual space your material occupies, air gaps and all in its broken chunks form the way you bring it in.”
That is why it pays to ask for a written bid that lists breaking, hauling and the dump fee as separate lines, so you can see which side of the line the tipping cost sits on. If you would rather the debris were simply someone else’s problem, a job that includes loading and hauling the broken concrete to a recycler takes that part off your plate. Our companion guide to which Seattle-area yards take broken concrete and what each one charges has the full list, the opening hours and the size limits.
Removal on its own, or remove and replace
If a new pour is following the tear-out, you are pricing two jobs, and the permit picture changes too: SDCI’s 750 square foot grading threshold, covered below, is about adding or replacing paving, not about removal on its own.
Two different jobs, two different bids
Remove and replace
- Demolition plus base preparation, forms, reinforcement, the pour and the finish.
- Replacing 750 square feet or more of paving brings in an SDCI grading permit.
- Ask for the demolition to be itemized anyway, so you can see what it actually costs.
Heavier work sits outside both columns. Foundation walls, steps and retaining structures are demolition rather than flatwork removal. Fixr’s national guide prices foundation removal at $4,000–$10,000, “depending on the size and how it was reinforced”; we found no published Seattle figure.
Where a permit changes the number
Seattle’s published grading-permit thresholds are about area, not about the fact of removal. SDCI’s paving page says a grading permit “is required if you add or replace 750 square feet (75 feet by 10 feet) or more of paving”, and that “if you remove existing paving and replace it, a grading permit is required once you reach the 750 square feet limit.”
Above 5,000 square feet of new or replaced paving, the same page says you are required to hire a civil engineer.
Removal on its own is not exempt from the grading code either. SDCI’s grading permit page counts “removing a hard surface (building, pavement, walkways, etc.)” as land-disturbing activity, and says a permit is needed where you “disturb land in an area that is 5,000 square feet or larger.”
On cost, SDCI says the grading review fee is based on the time the review takes at its hourly rate, plus a technology fee, so it is not a flat number you can budget from a web page.
Doing it yourself, and what that really saves
The saving from DIY is the labor, and Fixr’s national guide says “Labor makes up a big percentage of the cost to remove concrete”. What it is not is free. The same guide warns that “Breaking concrete is a difficult job”, and that renting a jackhammer to make it easier “is expensive because the project takes many hours to complete.”

Three costs survive the decision to do it yourself. You still pay at the gate: Renton Concrete Recyclers published a $45.00 minimum charge per load on 13 October 2026, so a small load is not a small bill. You still have to break the pieces down: Dirt Exchange’s cheapest concrete tier is capped at under 2 ft and no thicker than 8 in, and rebar is banned from it.
And you still have to get the load there. Reece’s yards are in Arlington and Lake Stevens, a round trip north into Snohomish County before you have paid a cent at the scale, and its rate is a per-ton rate, which is not comparable to a per-cubic-yard rate without weighing your load.
How to get a real number for your job
A measured quote is the only Seattle number that counts. Have these six things ready and a quote stops being a guess.
Send those measurements and a couple of photos and we’ll pass your details to one local concrete removal company, who will come back with a price for your slab rather than a national average. Get a price range →
One last caution about dates. The national figures were last updated in January 2025, and the recycling yards say their pricing is subject to change. We re-read every source on 13 October 2026 and date the page accordingly, but a five-minute call to the yard beats any web page, and a measured quote beats both.
Prices above come from Fixr (national), Dirt Exchange, Reece Aggregates and Renton Concrete Recyclers, with permit rules from the SDCI pages listed under sources. None of them is a price from this site.
Common questions
How much does concrete removal cost per square foot?
Fixr’s national cost guide, updated 31 January 2025 and re-read on 13 October 2026, puts concrete removal at $2–$6 per square foot across the United States: $2–$4 for unreinforced concrete and $4–$6 for reinforced concrete with rebar. Those are national figures, not Seattle prices and not prices from this site. A Seattle quote depends on the slab, the access and the dump fee, so get one measured.
How much does it cost to remove a concrete driveway?
Fixr’s national guide puts driveway removal at $1,500–$2,500 for most jobs, and patio removal at $1,000–$2,000. Those are United States averages last updated in January 2025, not Seattle figures. In Seattle the dump fee is a real part of the bill, because the city’s transfer stations do not accept concrete and it has to go to a recycler.
How much does concrete disposal cost in Seattle?
It depends on the yard and on the unit it uses. Read on 13 October 2026: Dirt Exchange in Ballard publishes $80.00 per cubic yard for clean concrete under 2 ft and no thicker than 8 in, $90.00 per cubic yard for oversized or dirty concrete, and $85.00 per cubic yard for a load of concrete mixed with dirt or brush. Reece Aggregates in Arlington publishes $6.00 per ton for clean concrete under 2 ft and $12.00 per ton with rebar. Renton Concrete Recyclers publishes no base dump fee but states a $45.00 minimum charge per load. Seattle’s own transfer stations do not accept concrete.
Do I need a permit to remove concrete in Seattle?
No City page we could find states whether removing a small private slab, on its own, requires a permit, so ask SDCI rather than assume. What SDCI does publish: a grading permit is required if you add or replace 750 square feet or more of paving, its grading page counts removing a hard surface as land-disturbing activity and requires a permit where you disturb 5,000 square feet or more, and it lists patio and concrete slabs on grade among projects that usually do not require a permit, a list prefaced “unless you’re in an environmentally critical area”. SDCI says SDOT oversees curb cut permits because curbs are on the City right-of-way, so work that reaches the sidewalk or curb is a separate question from a private slab.
Sources
- Fixr.com — How Much Does Concrete Removal Cost? (national averages) — checked 2026-10-13; effective Updated 31 January 2025
- Dirt Exchange — recycling drop-off pricing — checked 2026-10-13
- Reece Aggregates and Recycling — concrete & asphalt recycling — checked 2026-10-13
- Renton Concrete Recyclers — products and dump fees — checked 2026-10-13
- Seattle Public Utilities — transfer stations, NOT accepted materials — checked 2026-10-13
- Seattle SDCI — Paving (common projects) — checked 2026-10-13
- Seattle SDCI — Grading Permit — checked 2026-10-13
- Seattle SDCI — Do You Need a Permit? — checked 2026-10-13
- Seattle SDCI — Curb Cut Permit — checked 2026-10-13
More guides
- The adjacent property owner is responsible, unless City infrastructure caused the damage. Here is the permit you need, the tree-root rule, and when the City pays.
- Seattle bans concrete from its own transfer stations and King County excludes city residents — so here are the private recyclers that take it, with prices, and the size rule that matters more than rebar.
Rather not deal with it yourself?
Send a few photos and the rough size, and you’ll get a price range before anyone calls you.
Get your priceRelated: Concrete Driveway Removal · Concrete Patio Removal · Concrete Slab Removal · Concrete Hauling & Disposal
We are a Seattle concrete removal referral service. Tell us what needs to go and we'll connect you with one local concrete removal company — not five.