Who is responsible for sidewalk repair in Seattle?

The adjacent property owner is responsible, unless City infrastructure caused the damage. Here is the permit you need, the tree-root rule, and when the City pays.

Permit rules and fees change. Every rule below was read from the City of Seattle’s and Washington State’s own pages and last checked on September 13, 2026. Confirm before you act on it.

Concrete sidewalk panel lifted by street tree roots beside a planting strip on a residential Seattle street
AI illustration

In Seattle, the owner of the property next to the sidewalk is responsible for repairing it. You need an SDOT permit before the work starts — and if the damage is caused by City infrastructure, such as a City-owned street tree or sewer line, the City takes on the repair instead.

The short answer

  • SDOT says the Seattle Municipal Code (Chapter 15.72) requires adjacent property owners to keep the sidewalk in good repair.
  • The City pays when City infrastructure — a City-owned tree or sewer line — caused the damage.
  • Every repair needs a permit. Under 100 sq ft is a Right-of-Way Maintenance Permit, and the 2026 fee schedule lists sidewalk repair under 100 sq ft among uses with no base permit fee.
  • If a street tree is behind the damage, SDOT’s repair guide says to contact an SDOT arborist before starting work, and cutting roots 2 inches or more in diameter needs a Pruning Permit. Call (206) 684-TREE (8733).
  • If you ignore a repair notice, the code has SDOT do the work and the City Council assess the cost against your property as a lien.

The rule: the sidewalk in front of you is yours to fix

SDOT’s Sidewalk Repair Program page puts it plainly, and the guide it publishes for property owners names the chapter of the code behind it, SMC Chapter 15.72:

the Seattle Municipal Code requires that adjacent property owners keep their sidewalks in good repair and safe for public travel.
SDOT, Sidewalk Repair Program

That covers more than cracks. SDOT’s Property Owners’ Responsibilities page says owners maintain “the sidewalk and planting strip, or the roadway shoulder if unimproved.” Its repair guide lists the signs that need action: wide cracks, sections raised by tree roots, missing or broken pieces, and standing water after rain.

If the fix is breaking out and replacing a root-lifted sidewalk panel, SDOT’s guide says you are responsible for the cost, the permits and hiring qualified contractors, and that the finished repair must meet City standards.

When the City pays instead

There is one big exception, and it is the first thing to check before you spend anything. The same SDOT page says:

if the sidewalk damage is being caused by City infrastructure such as a City-owned tree or sewer line, the City will take the responsibility for making the repairs.
SDOT, Sidewalk Repair Program

Who pays for the repair

You pay

  • The sidewalk is next to your property and City infrastructure did not cause the damage.
  • Roots from a street tree the City did not plant lifted the panel. SDOT says such trees are typically the abutting owner’s to maintain, and the City takes on the repair only when City infrastructure, such as a City-owned tree, caused the damage.
  • You also pay for the permit and the contractor.

The City pays

  • A City-owned street tree is causing the damage.
  • A City sewer line or other City infrastructure is causing it.
  • The sidewalk is next to City-owned property, one of the two conditions for SDOT’s own repair program.

Two cautions. First, damage caused by other City agencies or public utilities is, in SDOT’s words, “forwarded on to the appropriate agency for repair.” Second, City responsibility does not mean a quick fix. SDOT says it has “a significant backlog of locations” and ranks repairs by factors like arterial streets, transit stops and nearby schools.

To ask SDOT to look at a damaged sidewalk, use the Find It, Fix It app, the online form, or call (206) 684-ROAD (7623). Investigating complaints and deciding who is responsible are both listed among the program’s jobs.

Tree roots: find out whose tree it is first

SDOT’s repair guide says raised or broken sidewalks are often caused by tree roots. Because the City only takes on repairs caused by City infrastructure, such as a City-owned tree, ownership of the tree decides who pays. SDOT’s repair program page says City-planted street trees are typically maintained by SDOT or the Parks Department, while trees planted by residents “with or without a street tree permit are the responsibility of the abutting property owner to maintain to City standards.”

To check, open SDOT’s Seattle Tree Inventory Map. Click a tree and it shows the party responsible for maintenance. The map covers roughly 40,000 inventoried city-maintained trees out of about 130,000 along Seattle streets, and SDOT says it is “for general information purposes only,” so a tree missing from the map is not proof it is yours. Call (206) 684-TREE to confirm.

Close-up of a cracked sidewalk panel raised by a tree root, creating a trip edge
A sidewalk panel lifted by a root. Whose tree it is decides who pays. (AI illustration)

The root rule matters even when the tree is yours. Before cutting roots, SDOT says you must get an arborist involved:

Prior to pruning tree roots greater than 2 inches in diameter, you must arrange for an SDOT Arborist to evaluate how the pruning will impact the tree’s health and public safety.
SDOT, Sidewalk Repair Program

SDOT’s Street Tree Permits page sets a separate requirement with a slightly different threshold: a Pruning Permit is needed for “branches or roots that are 2 inches or more in diameter.” That permit asks for a pruning plan, a site plan and a Registered Tree Service Provider. SDOT’s repair guide goes further and says to contact an SDOT arborist before starting any work where a street tree caused the damage, so call before anyone cuts.

Which permit you need, and what it costs

SDOT’s repair program page is clear that “the property owner or the contractor must obtain a Permit” before repairing a sidewalk. Its repair guide sets the permit type by the size of the area:

Area being repairedPermit
Under 100 sq ftRight-of-Way Maintenance Permit
Under 2,000 sq ftRight-of-Way Construction Permit
2,000 sq ft or moreStreet Improvement Permit
Source: SDOT Applicant Guide 1011, Sidewalk Maintenance and Repair Guide. SDOT calls these guidelines and may require a different permit type, for example for longer sidewalk closures.

On cost, SDOT’s 2026 Street Use fee schedule, effective January 1, 2026, lists “Sidewalk or Driveway Maintenance or Repair (less than 100 sq. ft.)” under Uses with No Base Permit Fee. That does not guarantee it is free. SDOT says an application may incur its hourly rate for inspection and review, billed separately, and the same schedule sets that 2026 rate at $367 an hour.

For a Maintenance permit, SDOT asks for a Right of Way Impact Plan, plus a Traffic Control Plan if the work affects people using the street or sidewalk. You apply through the Seattle Services Portal. SDOT did not publish a base fee for the larger Construction permit on the pages we checked, so ask (206) 684-5253 before you budget.

The repair process, step by step

Put together from SDOT’s repair guide, its permit pages and Washington State’s contractor rules, this is the order that avoids paying for work the City should have done:

Fixing a Seattle sidewalk

  1. Check who is responsible

    Look up the tree on the Seattle Tree Inventory Map, and report the damage through Find It, Fix It or (206) 684-ROAD if you think City infrastructure caused it.
  2. Call the SDOT arborist if roots are involved

    SDOT’s repair guide says to contact an SDOT arborist before starting work on a sidewalk damaged by a street tree: call (206) 684-TREE or email Seattle.Trees@seattle.gov.
  3. Get the right permit

    Match the permit to the area: Maintenance under 100 sq ft, Construction under 2,000 sq ft. Apply in the Seattle Services Portal.
  4. Hire a registered contractor

    Washington requires construction contractors to register with L&I and to be bonded and insured. Check them on L&I’s Verify a Contractor tool.
  5. Schedule the job start and inspection

    Before work begins, schedule a job start notification in the portal. SDOT’s guide says to contact your district inspector once the permit is approved.
Old sidewalk panel broken out and new wooden forms set for a fresh concrete pour
Once the permit is issued, the old panel comes out and forms go in for the new pour. (AI illustration)

The broken concrete has to go somewhere, too. Seattle’s own transfer stations do not accept it, so it pays to have the job include hauling the old slabs to a recycler. If you are doing the break-out yourself, our guide on which yards around Seattle take broken concrete, and what they charge lists the options.

Sidewalk panel lifted or cracked? Send us the rough size and a couple of photos, and we’ll pass your details to one local concrete removal company that can quote the break-out and haul-away. Get a price range →

What to do next

  • Before spending anything, check the tree map and report the damage. If a City tree or sewer line is the cause, the repair is the City’s.
  • If it is yours, measure the area. That sets the usual permit, though SDOT says its size guidelines are not fixed and it may require a different permit type.
  • If roots are involved, call (206) 684-TREE before anyone cuts.
  • If the driveway apron is broken too, it is worth pricing replacing the driveway section at the same time, since it is also work in the right-of-way.

This page quotes the rules; it is not legal advice. Your situation depends on the tree, the pipe and the exact lot line, so confirm yours with SDOT at (206) 684-5253 before work starts. We cover neighborhoods across Seattle and can put you in touch with one local company when you are ready.

The rules above come from the SDOT Sidewalk Repair Program and the other City and state pages listed under sources.

Common questions

Does the City pay for sidewalk repair in Seattle?

Only in specific cases. SDOT says that if the damage is caused by City infrastructure, such as a City-owned tree or sewer line, the City will take responsibility for the repair. Otherwise, SDOT says the Seattle Municipal Code requires the adjacent property owner to keep the sidewalk in good repair. SDOT also notes a significant backlog, so City-responsible repairs can take time.

Do I need a permit to repair a sidewalk in Seattle?

Yes. SDOT says the property owner or the contractor must obtain a permit before repairing a sidewalk. Its repair guide sets the type by area: a Right-of-Way Maintenance Permit under 100 sq ft, a Right-of-Way Construction Permit under 2,000 sq ft, and a Street Improvement Permit at 2,000 sq ft or more.

Can I repair my own sidewalk?

SDOT’s repair guide says you are responsible for the cost, the permits and hiring qualified contractors, and that the repair must meet City standards. It lists hiring a contractor as “if needed”, and SDOT’s repair program page says the property owner or the contractor must obtain the permit. SDOT’s guide adds that major repairs, like replacing large sections of concrete, may require a professional contractor. Call SDOT at (206) 684-5253 to confirm for your job.

How do I fix a sidewalk raised by tree roots?

First find out whose tree it is on SDOT’s Seattle Tree Inventory Map, because a City-owned tree makes the repair the City’s. SDOT’s repair guide says to have an SDOT arborist evaluate the tree before starting work, and its Street Tree Permits page says cutting roots 2 inches or more in diameter needs a Pruning Permit. Call (206) 684-TREE, then get the sidewalk permit and replace the lifted panel.

What are Seattle’s planting strip rules?

SDOT says property owners maintain the planting strip next to their property, and that construction in a planting strip requires a Street Use Permit. SDOT’s Client Assistance Memo 2304, last revised in February 2020, says up to 40% of a planting strip may be paved if the paving is combined with street trees, related landscape features pose no safety concern, the mix gives an equal or better balance of benefits than a fully planted strip, and the paved area is not used for parking.

Do I need a permit to close a sidewalk in Seattle?

SDOT’s Right-of-Way Maintenance permit page treats a sidewalk closure as one of the project’s mobility impacts. That permit is meant for projects with sidewalk closures of less than 5 days on an arterial street or less than 20 days on a non-arterial street. Longer closures need a Right-of-Way Construction permit, and a Traffic Control Plan is required when work affects mobility.

More guides

  • Where to dump concrete in Seattle

    Seattle bans concrete from its own transfer stations and King County excludes city residents — so here are the private recyclers that take it, with prices, and the size rule that matters more than rebar.

Rather not deal with it yourself?

Send a few photos and the rough size, and you’ll get a price range before anyone calls you.