
Concrete removal in Shoreline
We are a Seattle concrete removal referral service. Tell us what needs to go and we'll connect you with one local concrete removal company — not five.
Shoreline sits right on Seattle's northern edge, and the city line makes a real difference to a concrete job. A Shoreline homeowner can take a load to King County's Shoreline transfer station on N 165th St. Someone a short drive south, inside Seattle, can't, because King County's service area excludes the City of Seattle.
Shoreline's own right-of-way rules are also more paperwork-heavy than most for small jobs. Here's what to expect and how to plan around it. Tell us about the job and we'll pass it to one local concrete removal contractor. It costs you nothing.
Local facts for Shoreline
- Permit lead time
- Shoreline right-of-way permit applications must be submitted 10 working days or more before work starts, and approved permits are valid for 180 days. Source: City of Shoreline: FAQ Right of Way Permits
- Driveway aprons
- Installing a driveway apron or modifying an existing one is listed as work that requires a Shoreline right-of-way use permit. Source: City of Shoreline: Right-of-Way Use Permit
- Insurance and engineering
- Contractors must provide liability insurance naming the City of Shoreline as additional insured, and curb, gutter or sidewalk work needs drawings from a licensed civil engineer. Source: City of Shoreline: Right-of-Way Use Permit
- Transfer station
- Shoreline Recycling & Transfer Station, 2300 N 165th St, with a 40-ft maximum vehicle and trailer length. It serves King County's service area, which does not include the City of Seattle. Source: King County: Guide to Recycling & Transfer Facilities
Driveway aprons need a permit, and 10 working days' notice
Shoreline requires a right-of-way use permit for all construction in or use of the public right-of-way, and gives installing or modifying a driveway apron as its first example. If your driveway removal runs to the street, the last stretch is permitted work.
Timing is the part people miss. The city's FAQ says applications must be submitted 10 working days or more before work starts. Once approved, a right-of-way permit is valid for 180 days. Applications are made online through the city's eTRAKiT portal.
Insurance and engineering: questions to put to a contractor
Two requirements on Shoreline's checklist sort contractors quickly. For any work in the right-of-way, contractors and individuals must provide a certificate of liability insurance naming the City of Shoreline as additional insured. Ask early whether they can produce one. A contractor who has worked in Shoreline before will know the drill.
The second is drawings. Shoreline requires plans prepared by a licensed civil engineer for projects that include curb, gutter, sidewalk, street widening, or storm drainage and wastewater improvements. That doesn't affect a patio or a backyard slab. But if a driveway job grows to replace curb or a section of sidewalk, check how the contractor will handle the engineering, and allow for it in your timeline.
- Can you supply a liability certificate naming the City of Shoreline as additional insured?
- Who submits the permit, and when? It needs 10 working days' lead time.
- Will any part of the job touch curb, gutter or sidewalk, and if so who prepares the civil drawings?
- Does the work need a traffic control plan? Shoreline points to its Engineering Development Manual for those.
Disposal and reuse at the Shoreline station
The Shoreline Recycling & Transfer Station is at 2300 N 165th St and allows vehicle-and-trailer combinations up to 40 feet. King County rules on C&D debris apply. Dump trucks and dump trailers are refused unless C&D is under 20% of the load, and dense pieces over 2 x 2 x 2 feet and 200 pounds need a waste clearance. That makes it a homeowner option for small loads rather than where a contractor's truck goes. Our disposal guide covers recyclers for bigger loads.
One extra outside the station: a Second Use collection area takes reusable building materials in good condition, such as doors, windows, cabinets and lumber 6 feet or longer. It's no help with concrete, but useful if the job comes with an old gate or framing.
Questions about concrete removal in Shoreline
Do I need a permit to replace my driveway apron in Shoreline?
Yes. Shoreline lists installing or modifying a driveway apron as work that needs a right-of-way use permit. Apply at least 10 working days before the work is due to start.
How long is a Shoreline right-of-way permit good for?
180 days from the date it's issued, according to the city's right-of-way FAQ.
Can Seattle residents use the Shoreline transfer station?
No. King County says its service area doesn't include the cities of Seattle or Milton, so its stations, Shoreline included, aren't open to Seattle residents. Shoreline residents are inside the service area.
Does my contractor need special insurance to work in Shoreline?
For work in the public right-of-way, yes. Shoreline requires a certificate of liability insurance naming the City of Shoreline as additional insured from any contractor not working for a franchised utility.
Near Shoreline
Sources
Get a price for Shoreline
Send a few details and photos if you have them. We come back with a price range, then pass your details to one local concrete removal company. It costs you nothing.