Concrete driveway part-way through removal in Tukwila, King County

Concrete removal in Tukwila

We are a Seattle concrete removal referral service. Tell us what needs to go and we'll connect you with one local concrete removal company — not five.

✓ One local company, not five
⚡ Free, no-obligation price

Tukwila's right-of-way permit comes with a longer paperwork list than most homeowners expect. For a driveway apron, curb cut or sidewalk, the city's checklist asks for a Tukwila business license, a state contractor's license and a notarized indemnification agreement before review starts. In practice that means the company doing the work usually holds the permit.

Tukwila is also home to Bow Lake, the busiest transfer station in the King County system. Below is what the city asks for and what to settle before work starts. When you are ready, send us the details. We pass your job to one local concrete removal company, and asking costs you nothing.

Local facts for Tukwila

One permit for driveways and sidewalks
Tukwila's Right of Way Use, Non-Franchise Permit covers sidewalks, driveways, curb ramps and frontage landscaping, for contractors and property owners alike, under TMC Title 11. Source: City of Tukwila: Right-of-Way Use, Non-Franchise Permit overview
Licenses and notarized indemnity
The application requires a current Tukwila business license, a Washington L&I contractor's license, a notarized Indemnification and Hold Harmless agreement, proof of insurance, and civil plans stamped by a Washington-licensed PE. Source: City of Tukwila: Right-of-Way Use, Non-Franchise Permit checklist
Haul route threshold
Tukwila asks for a haul route when a job will haul more than 6 loaded vehicles per 8-hour day, and a geotechnical report for sites on or next to steep slopes or in a critical area. Source: City of Tukwila: Right-of-Way Use, Non-Franchise Permit checklist
Bow Lake transfer station is in Tukwila
King County's Bow Lake Recycling and Transfer Station, 18800 Orillia Road S, Tukwila, is the busiest station in the county system, processing about one third of its tonnage. Source: King County: Bow Lake Recycling and Transfer Station fact sheet

Which permit covers driveway and sidewalk work

Tukwila calls it the Right of Way Use, Non-Franchise Permit (PW). The city says it covers work in the public right-of-way "or on private property that connects to or affects public infrastructure," and it applies to "private developers, contractors, or property owners." Among the typical activities it lists are "sidewalks, driveways, curb ramps, and frontage landscaping," along with paving, grading and temporary construction staging.

All work under the permit must meet the city's Infrastructure Design and Construction Standards and Tukwila Municipal Code Title 11.

What the application checklist asks for

The city's checklist marks some items as required on every application and others as "required only if applicable." For a typical homeowner's driveway or sidewalk job, these are the ones to plan for:

  • A current City of Tukwila business license
  • Proof of a valid contractor's license with Washington State Labor & Industries
  • A completed, notarized Indemnification and Hold Harmless agreement
  • Proof of insurance, under TMC 11.08.150
  • A site plan, plus civil plans stamped by a Washington-licensed Professional Engineer
  • A traffic control plan if the work affects travel lanes, sidewalks or bike routes
  • A performance bond if the work disturbs hard surface in the right-of-way
  • A geotechnical report if the site is on or next to steep slopes or in a designated critical area

Hauling out of a Tukwila site

The same checklist asks for a haul route when a job runs "more than 6 loaded vehicles per 8 hour day." A single driveway rarely gets there, but a large slab or a commercial lot can. Ask anyone quoting a big job how many truckloads they expect.

Concrete wholly inside your lot, such as a patio or shed base, does not need this right-of-way permit. Access still matters: say whether a truck can reach the slab, or whether debris will be wheeled out to the street.

Questions about concrete removal in Tukwila

Do I need a permit to replace a driveway in Tukwila?

The part of the driveway in or connecting to the public right-of-way needs Tukwila's Right of Way Use, Non-Franchise Permit, which lists driveways, sidewalks and curb ramps among its typical activities.

Can a homeowner apply for a Tukwila right-of-way permit?

The permit applies to property owners as well as contractors, but the checklist asks for a Tukwila business license, an L&I contractor's license and PE-stamped civil plans, so the contractor doing the work usually applies.

Where is the Tukwila permit center?

6300 Southcenter Blvd, Suite 100, Tukwila, WA 98188.

Can Tukwila residents take concrete to Bow Lake?

Tukwila is inside King County's service area, so residents can use Bow Lake. County rules limit dense pieces and dump-trailer loads; our guide to where to dump concrete covers them and the recyclers nearby.

Near Tukwila

Sources

  1. City of Tukwila: Right-of-Way Use, Non-Franchise Permit overview and checklist
  2. King County: Bow Lake Recycling and Transfer Station fact sheet
  3. King County: Solid waste facilities and service area

Get a price for Tukwila

Send a few details and photos if you have them. We come back with a price range, then pass your details to one local concrete removal company. It costs you nothing.

We are a referral service. Your details go to one local concrete removal company — not an auction, and not five companies calling you. They are an independent business, not our employee, so their work, pricing and conduct are theirs.

No obligation. Your details go to one local company, not five.